ADAM TECH PCB-C-30-T-20 Connector FFC-FPC

Conn FFC Top Entry .100 inch Inline Through-Hole

Product Technical Specifications

Symbols and Footprints

No Stock Available

Quantity Increments of 1 Minimum 5000
  • Ships from:
    United States of America
    Manufacturer Lead Time:
    12 weeks
    • Price:

ADAM TECHPCB-C-30-T-20Connector FFC-FPC

Conn FFC Top Entry .100 inch Inline Through-Hole

No Stock Available

Quantity Increments of 1 Minimum 5000
  • Ships from:
    United States of America
    Manufacturer Lead Time:
    12 weeks
    • Price: