TPS659121EVM-081, Evaluation Module using TPS659121 a power management unit (PMU) for Processor Power

Reference Design using part TPS659121YFF by Texas Instruments

Manufacturer

Texas Instruments
  • Application Category
    Power Supplies
  • Product Type
    DC to DC Multi-Output Power Supplies

For End Products

  • Smart Phone
  • Wireless Data Access Card

Description

  • TPS659121EVM-081, Evaluation Module (EVM) is designed to facilitate evaluation of the power management integrated circuit. It also contains 10 LDO regulators for external usage which can be supplied from either a battery or a pre-regulated supply. Power-up/power-down controller is configurable and can support any power-up/power-down sequences (OTP based). The TPS659121 integrates a 32 kHz RC Oscillator to sequence all resources during Power up / down

Key Features

  • Conversion Type
    DC to DC
  • Input Voltage
    3 to 5 V
  • Topology
    Buck

We've updated our privacy policy. Please take a moment to review these changes. By clicking I Agree to Arrow Electronics Terms Of Use  and have read and understand the Privacy Policy and Cookie Policy.

Our website places cookies on your device to improve your experience and to improve our site. Read more about the cookies we use and how to disable them here. Cookies and tracking technologies may be used for marketing purposes.
By clicking “Accept”, you are consenting to placement of cookies on your device and to our use of tracking technologies. Click “Read More” below for more information and instructions on how to disable cookies and tracking technologies. While acceptance of cookies and tracking technologies is voluntary, disabling them may result in the website not working properly, and certain advertisements may be less relevant to you.
We respect your privacy. Read our privacy policy here