LP5907UV-1.2EVM, Evaluation Board for the LP5907UV-1.2 linear regulator capable of supplying 250 mA output current

使用 Texas Instruments 的 LP5907UVE-1.2/NOPB 的参考设计

供应商

Texas Instruments
  • 应用类别
    电源
  • 产品类别
    直流到直流单输出电源

依据最终产品

  • Power Supplies

说明

  • LP5907UV-1.2EVM, Evaluation Board for the LP5907UV-1.2 linear regulator capable of supplying 250 mA output current. Designed to meet the requirements of RF/Analog circuits, the LP5907 device provides low noise, high PSRR, low quiescent current and low line/load transient response figures. Using new innovative design techniques the LP5907 offers class-leading noise performance without a noise bypass capacitor and the ability for remote output capacitor placement. The device is designed to work with a 1.0 uF input and a 1.0 uF output ceramic capacitor. The device is available in an ultra-thin micro SMD package

主要特色

  • Conversion Type
    DC to DC
  • Output Current
    0.25 A

请仔细阅读我们近期更改的隐私政策。当按下确认键时,您已了解并同意艾睿电子的隐私政策和用户协议。

本网站需使用cookies以改善用户您的体验并进一步改进我们的网站。此处阅读了解关于网站cookies的使用以及如何禁用cookies。网页cookies和追踪功能或許用于市场分析。当您按下同意按钮,您已经了解并同意在您的设备上接受cookies,并给予网站追踪权限。更多关于如何取消网站cookies及追踪的信息,请点击下方“阅读更多”。尽管同意启用cookies追踪与否取决用户意愿,取消网页cookies及追踪可能导致网站运作或显示异常,亦或导致相关推荐广告减少。

我们尊重您的隐私。请在此阅读我们的隐私政策。