Typical Application Circuit for A8591 Wide Input Voltage, 2A Buck Regulator Family with Critical Paths/Loops Shown

使用 Allegro MicroSystems 的 A8591 的参考设计

供应商

Allegro MicroSystems
  • 应用类别
    电源
  • 产品类别
    直流到直流多输出电源

依据最终产品

  • Home Theater
  • HVAC
  • Industrial
  • Instrument Cluster
  • Navigation System
  • Networking
  • Stereo Audio System
  • Telecom System

说明

  • Typical Application Circuit for A8591 Wide Input Voltage, 2A Buck Regulator Family with Critical Paths/Loops Shown. The A8591 is designed to provide the power supply requirements of next generation car audio and infotainment systems. The A8591 provides all the control and protection circuitry to produce a high-current regulator with ±1% output voltage accuracy. The A8591 employs current-mode control to provide simple compensation, excellent stability and fast transient response

主要特色

  • Conversion Type
    DC to DC
  • Input Voltage
    40 V
  • Output Voltage
    3.3|5 V
  • Output Current
    2 A
  • Topology
    Buck

请仔细阅读我们近期更改的隐私政策。当按下确认键时,您已了解并同意艾睿电子的隐私政策和用户协议。

本网站需使用cookies以改善用户您的体验并进一步改进我们的网站。此处阅读了解关于网站cookies的使用以及如何禁用cookies。网页cookies和追踪功能或許用于市场分析。当您按下同意按钮,您已经了解并同意在您的设备上接受cookies,并给予网站追踪权限。更多关于如何取消网站cookies及追踪的信息,请点击下方“阅读更多”。尽管同意启用cookies追踪与否取决用户意愿,取消网页cookies及追踪可能导致网站运作或显示异常,亦或导致相关推荐广告减少。

我们尊重您的隐私。请在此阅读我们的隐私政策。