TPS54229EVM-056, Evaluation Board using TPS54229 Single, adaptive on-time, 2-A Synchronous Step-Down DCAP2 Mode Converter

Reference Design using part TPS54229DDA by Texas Instruments

Manufacturer

Texas Instruments
  • Application Category
    Power Supplies
  • Product Type
    DC to DC Single Output Power Supplies

For End Products

  • High Definition Blue-ray Disc Player
  • Networking Home Terminal
  • Power Supplies
  • Set-Top Box

Description

  • TPS54229EVM-056, Evaluation Board using TPS54229 single, adaptive on-time, D-CAP2-mode, synchronous buck converter requiring a low, external component count. The D-CAP2 control circuit is optimized for low-ESR output capacitors such as POSCAP, SP-CAP, or ceramic types and features fast transient response with no external compensation. The switching frequency is internally set at a nominal 650 kHz. The high-side and low-side switching MOSFETs are incorporated inside the TPS54229 package along with the gate drive circuitry

Key Features

  • Conversion Type
    DC to DC
  • Input Voltage
    4.5 to 18 V
  • Output Voltage
    1.05 V
  • Output Current
    2 A
  • Efficiency
    86.5 %
  • Topology
    Buck

We've updated our privacy policy. Please take a moment to review these changes. By clicking I Agree to Arrow Electronics Terms Of Use  and have read and understand the Privacy Policy and Cookie Policy.

Our website places cookies on your device to improve your experience and to improve our site. Read more about the cookies we use and how to disable them here. Cookies and tracking technologies may be used for marketing purposes.
By clicking “Accept”, you are consenting to placement of cookies on your device and to our use of tracking technologies. Click “Read More” below for more information and instructions on how to disable cookies and tracking technologies. While acceptance of cookies and tracking technologies is voluntary, disabling them may result in the website not working properly, and certain advertisements may be less relevant to you.
We respect your privacy. Read our privacy policy here