DLPDLCR3010EVM, DLP Light Crafter Display 3010 Evaluation Module
Diseño de referencia usando la pieza DLP3010 de Texas Instruments
Documentos asociados
Para productos finales
- Consumer Electronics
- Digital Signage
- Industrial
- Medical and Healthcare
Descripción
- DLPDLCR3010EVM, DLP Light Crafter Display 3010 Evaluation Module is an easy-to-use, plug-and-play evaluation platform for a wide array of display applications in consumer, signage, wearables, industrial and medical markets. EVM features the DLP3010 chipset comprising of DLP3010 (.3 720p) HD DMD, DPC3435 display controller and DLPA2005 PMIC/LED driver. This EVM comes equipped with a production ready optical engine and offers a compelling combination of resolution (HD), brightness and programmability in a small-form factor
Características clave
-
Embedded System TypeSoC
Piezas destacadas (23)
Número de pieza | Fabricante | Tipo | Descripción | |||
---|---|---|---|---|---|---|
|
TPS2061CDBVT | Texas Instruments | USB Power Switches | Power Switch Hi Side 1-OUT 96mOhm 5-Pin SOT-23 T/R | AÑADIR AL CARRITO | |
|
TPS71501DCKR | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.205V to 15V 0.05A 5-Pin SC-70 T/R | AÑADIR AL CARRITO | |
|
TXS0102DCUT | Texas Instruments | Level Translators | Voltage Level Translator 2-CH Bidirectional 8-Pin VSSOP T/R | AÑADIR AL CARRITO | |
|
TXS0102DCUR | Texas Instruments | Level Translators | Voltage Level Translator 2-CH Bidirectional 8-Pin VSSOP T/R | AÑADIR AL CARRITO | |
|
SN74AUP1G07DCKR | Texas Instruments | Buffers and Line Drivers | Buffer/Driver 1-CH Non-Inverting Open Drain CMOS 5-Pin SC-70 T/R | AÑADIR AL CARRITO | |
|
SN74AUP1G07DCKR-870868208 | Texas Instruments | Buffers and Line Drivers | Buffer/Driver 1-CH Non-Inverting Open Drain CMOS 5-Pin SC-70 T/R | AÑADIR AL CARRITO | |
|
SN74AUP1G06DCKR | Texas Instruments | Buffers and Line Drivers | Inverter Schmitt Trigger 1-Element CMOS 5-Pin SC-70 T/R | AÑADIR AL CARRITO | |
|
SN74AUP1G07DCKR-203169503 | Texas Instruments | Buffers and Line Drivers | Buffer/Driver 1-CH Non-Inverting Open Drain CMOS 5-Pin SC-70 T/R | AÑADIR AL CARRITO | |
|
DLPC3435ZEZR | Texas Instruments | Display Drivers | Digital Display Controller | AÑADIR AL CARRITO | |
|
DLPA2005ERSLR | Texas Instruments | PMIC Solutions | PMIC/LED Driver 2.7V to 6V 48-Pin VQFN EP T/R | AÑADIR AL CARRITO | |
|
CY7C65215-32LTXIT | Infineon Technologies AG | USB Interface ICs | Full Speed USB Serial Dual Channel Bridge with CapSense and BCD USB 2.0 1.8V/2.5V/3.3V/5V T/R 32-Pin QFN EP | AÑADIR AL CARRITO | |
|
ABM8-27.000MHZ-B2-T | Abracon | Crystals | Crystal 27MHz ±20ppm (Tol) ±50ppm (Stability) 18pF FUND 50Ohm 4-Pin CSMD T/R | AÑADIR AL CARRITO |