ADS6425EVM, Evaluation Board using ADS6425, dual channel, 12-bit, 125 MSPS Analog-to-Digital Converter
Progetto di riferimento usando la parte ADS6425 di Texas Instruments
Per prodotti finali
- Analog Receiver
- Medical Imaging
- Test Equipment
- Wireless Base Station
Per contattare il Servizio Clienti.
- ADS6425EVM, Evaluation Board using ADS6425, dual channel, 12-bit, 125 MSPS Analog-to-Digital Converter. It provides a platform for evaluating the dual channel analog-to-digital converters (ADC) under various signal, reference, and supply conditions
Funzioni principali
-
ADC Resolution12 Bit
-
ADC Sampling Rate125M SPS
-
Number of Channels2CH
Parti in primo piano (6)
Numero parte | Produttore | Tipo | Per contattare il Servizio Clienti. | |||
---|---|---|---|---|---|---|
|
KT11P3JM34 LFS | C&K | Switch Tactile | Switch Tactile OFF Mom SPST Round Button J-Lead 32VAC 32VDC 1VA 100000Cycles 3N SMD T/R | AGGIORNA | |
|
THS4509RGTT | Texas Instruments | Special Purpose Amplifiers | SP Amp DIFF AMP Single ±2.625V/5.25V 16-Pin VQFN EP T/R | AGGIORNA | |
|
YT1053530FPLFS | C&K | Switch Tactile | Switch Tactile OFF Mom SPST Round Button J-Lead 32VAC 32VDC 1VA 100000Cycles 3N SMD T/R | AGGIORNA | |
|
ADS6425IRGC25 | Texas Instruments | Analog to Digital Converters - ADCs | 4-Channel Quad ADC Pipelined 125Msps 12-bit Serial (1-Wire, 2-Wire)/LVDS 64-Pin VQFN EP T/R | AGGIORNA | |
|
ADS6425IRGCT | Texas Instruments | Analog to Digital Converters - ADCs | 4-Channel Quad ADC Pipelined 125Msps 12-bit Serial (1-Wire, 2-Wire)/LVDS 64-Pin VQFN EP T/R | AGGIORNA | |
|
ADS6425IRGCR | Texas Instruments | Analog to Digital Converters - ADCs | 4-Channel Quad ADC Pipelined 125Msps 12-bit Serial (1-Wire, 2-Wire)/LVDS 64-Pin VQFN EP T/R | AGGIORNA |